<?xml version="1.0" encoding="UTF-8"?>
<dataroot xmlns:od="urn:schemas-microsoft-com:officedata">
<APB1>
<Current_Company_Name>Alectra Utilities Corporation</Current_Company_Name>
<Historical_Company_Name>Alectra Utilities Corporation</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>1908</Pole_Towers_Fixtures>
<Line_Transformers>2078</Line_Transformers>
<Meters>21217</Meters>
</APB1>
<APB1>
<Current_Company_Name>Alectra Utilities Corporation</Current_Company_Name>
<Historical_Company_Name>Alectra Utilities Corporation</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>1701</Pole_Towers_Fixtures>
<Line_Transformers>2431</Line_Transformers>
<Meters>44481</Meters>
</APB1>
<APB1>
<Current_Company_Name>Algoma Power Inc.</Current_Company_Name>
<Historical_Company_Name>Algoma Power Inc.</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>673</Pole_Towers_Fixtures>
<Line_Transformers>169</Line_Transformers>
<Meters>306</Meters>
<APB1_Comments_Provided_By_Distributors>Quantities are based on the total capitalized (does not taken into consideration material charged out to work orders that remain in AUC at EOY 2023)</APB1_Comments_Provided_By_Distributors>
</APB1>
<APB1>
<Current_Company_Name>Algoma Power Inc.</Current_Company_Name>
<Historical_Company_Name>Algoma Power Inc.</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>469</Pole_Towers_Fixtures>
<Line_Transformers>140</Line_Transformers>
<Meters>235</Meters>
</APB1>
<APB1>
<Current_Company_Name>Atikokan Hydro Inc.</Current_Company_Name>
<Historical_Company_Name>Atikokan Hydro Inc.</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>38</Pole_Towers_Fixtures>
<Line_Transformers>2</Line_Transformers>
<Meters>0</Meters>
<APB1_Comments_Provided_By_Distributors>Account 1850 &amp; 1860 Note: Atikokan puts all transformer and meter purchases directly to USoA 1850 and 1860 whether in services or reserve as per the APH description. Transformers and meters in reserve are not inventory but recorded in the CAPEX. The quantity for both transformers and meters for this date reflects the install per the question, but wlil not correlate to the USoA dollars because of Atikokan&apos;s intreptation of the APH and processes for data keeping and recording.</APB1_Comments_Provided_By_Distributors>
</APB1>
<APB1>
<Current_Company_Name>Atikokan Hydro Inc.</Current_Company_Name>
<Historical_Company_Name>Atikokan Hydro Inc.</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>26</Pole_Towers_Fixtures>
<Line_Transformers>4</Line_Transformers>
<Meters>2</Meters>
<APB1_Comments_Provided_By_Distributors>Account 1850 &amp; 1860 Note: Atikokan puts all transformer and meter purchases directly to USoA 1850 and 1860 whether in services or reserve as per the APH description. Transformers and meters in reserve are not inventory but recorded in the CAPEX. The quantity for both transformers and meters for this data reflects the install per the question, but will not correlate to the USoA dollars because of Atikokan&apos;s intreptation of the APH and processes for data keeping and recording.</APB1_Comments_Provided_By_Distributors>
</APB1>
<APB1>
<Current_Company_Name>Bluewater Power Distribution Corporation</Current_Company_Name>
<Historical_Company_Name>Bluewater Power Distribution Corporation</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>233</Pole_Towers_Fixtures>
<Line_Transformers>126</Line_Transformers>
<Meters>475</Meters>
</APB1>
<APB1>
<Current_Company_Name>Bluewater Power Distribution Corporation</Current_Company_Name>
<Historical_Company_Name>Bluewater Power Distribution Corporation</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>253</Pole_Towers_Fixtures>
<Line_Transformers>123</Line_Transformers>
<Meters>709</Meters>
</APB1>
<APB1>
<Current_Company_Name>Burlington Hydro Inc.</Current_Company_Name>
<Historical_Company_Name>Burlington Hydro Inc.</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>189</Pole_Towers_Fixtures>
<Line_Transformers>81</Line_Transformers>
<Meters>7008</Meters>
</APB1>
<APB1>
<Current_Company_Name>Burlington Hydro Inc.</Current_Company_Name>
<Historical_Company_Name>Burlington Hydro Inc.</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>189</Pole_Towers_Fixtures>
<Line_Transformers>139</Line_Transformers>
<Meters>8021</Meters>
</APB1>
<APB1>
<Current_Company_Name>Canadian Niagara Power Inc.</Current_Company_Name>
<Historical_Company_Name>Canadian Niagara Power Inc.</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>340</Pole_Towers_Fixtures>
<Line_Transformers>159</Line_Transformers>
<Meters>541</Meters>
<APB1_Comments_Provided_By_Distributors>CNP count (poles = 336, TX = 145, Meters = 513), EOP ( poles = 4, TX = 14, meters = 28)</APB1_Comments_Provided_By_Distributors>
</APB1>
<APB1>
<Current_Company_Name>Canadian Niagara Power Inc.</Current_Company_Name>
<Historical_Company_Name>Canadian Niagara Power Inc.</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>441</Pole_Towers_Fixtures>
<Line_Transformers>163</Line_Transformers>
<Meters>842</Meters>
</APB1>
<APB1>
<Current_Company_Name>Centre Wellington Hydro Ltd.</Current_Company_Name>
<Historical_Company_Name>Centre Wellington Hydro Ltd.</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>69</Pole_Towers_Fixtures>
<Line_Transformers>10</Line_Transformers>
<Meters>18</Meters>
<APB1_Comments_Provided_By_Distributors>Upon the delivery of Transformers and Meters to CWH, the asset is recorded in acct 1850 and 1860 - even if it is a stock item. This aligns with values that are submitted in OEB RRR submissions and asset continuity</APB1_Comments_Provided_By_Distributors>
</APB1>
<APB1>
<Current_Company_Name>Centre Wellington Hydro Ltd.</Current_Company_Name>
<Historical_Company_Name>Centre Wellington Hydro Ltd.</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>23</Pole_Towers_Fixtures>
<Line_Transformers>15</Line_Transformers>
<Meters>564</Meters>
<APB1_Comments_Provided_By_Distributors>Upon the delivery of Transformers and Meters to CWH, the asset is recorded in acct 1850 and 1860 - even if it is a stock item. This aligns with values that are submitted in OEB RRR submissions and asset continuity</APB1_Comments_Provided_By_Distributors>
</APB1>
<APB1>
<Current_Company_Name>Cooperative Hydro Embrun Inc.</Current_Company_Name>
<Historical_Company_Name>Cooperative Hydro Embrun Inc.</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>5</Pole_Towers_Fixtures>
<Line_Transformers>14</Line_Transformers>
<Meters>150</Meters>
<APB1_Comments_Provided_By_Distributors>Consisting to connect nes service,replace aging equipment,new subdivision and inventory</APB1_Comments_Provided_By_Distributors>
</APB1>
<APB1>
<Current_Company_Name>Cooperative Hydro Embrun Inc.</Current_Company_Name>
<Historical_Company_Name>Cooperative Hydro Embrun Inc.</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>3</Pole_Towers_Fixtures>
<Line_Transformers>1</Line_Transformers>
<Meters>150</Meters>
<APB1_Comments_Provided_By_Distributors>1830 consist of three pole replacement (Aging)</APB1_Comments_Provided_By_Distributors>
</APB1>
<APB1>
<Current_Company_Name>E.L.K. Energy Inc.</Current_Company_Name>
<Historical_Company_Name>E.L.K. Energy Inc.</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>25</Pole_Towers_Fixtures>
<Line_Transformers>19</Line_Transformers>
<Meters>276</Meters>
</APB1>
<APB1>
<Current_Company_Name>E.L.K. Energy Inc.</Current_Company_Name>
<Historical_Company_Name>E.L.K. Energy Inc.</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>14</Pole_Towers_Fixtures>
<Line_Transformers>16</Line_Transformers>
<Meters>140</Meters>
</APB1>
<APB1>
<Current_Company_Name>Elexicon Energy Inc.</Current_Company_Name>
<Historical_Company_Name>Elexicon Energy Inc.</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>488</Pole_Towers_Fixtures>
<Line_Transformers>449</Line_Transformers>
<Meters>2516</Meters>
</APB1>
<APB1>
<Current_Company_Name>Elexicon Energy Inc.</Current_Company_Name>
<Historical_Company_Name>Elexicon Energy Inc.</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>483</Pole_Towers_Fixtures>
<Line_Transformers>259</Line_Transformers>
<Meters>2336</Meters>
</APB1>
<APB1>
<Current_Company_Name>Enova Power Corp.</Current_Company_Name>
<Historical_Company_Name>Enova Power Corp.</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>1095</Pole_Towers_Fixtures>
<Line_Transformers>595</Line_Transformers>
<Meters>1846</Meters>
</APB1>
<APB1>
<Current_Company_Name>Enova Power Corp.</Current_Company_Name>
<Historical_Company_Name>Enova Power Corp.</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>706</Pole_Towers_Fixtures>
<Line_Transformers>441</Line_Transformers>
<Meters>1975</Meters>
</APB1>
<APB1>
<Current_Company_Name>Entegrus Powerlines Inc.</Current_Company_Name>
<Historical_Company_Name>Entegrus Powerlines Inc.</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>326</Pole_Towers_Fixtures>
<Line_Transformers>174</Line_Transformers>
<Meters>4368</Meters>
</APB1>
<APB1>
<Current_Company_Name>Entegrus Powerlines Inc.</Current_Company_Name>
<Historical_Company_Name>Entegrus Powerlines Inc.</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>366</Pole_Towers_Fixtures>
<Line_Transformers>160</Line_Transformers>
<Meters>6239</Meters>
</APB1>
<APB1>
<Current_Company_Name>ENWIN Utilities Ltd.</Current_Company_Name>
<Historical_Company_Name>ENWIN Utilities Ltd.</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>449</Pole_Towers_Fixtures>
<Line_Transformers>184</Line_Transformers>
<Meters>1680</Meters>
</APB1>
<APB1>
<Current_Company_Name>ENWIN Utilities Ltd.</Current_Company_Name>
<Historical_Company_Name>ENWIN Utilities Ltd.</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>408</Pole_Towers_Fixtures>
<Line_Transformers>186</Line_Transformers>
<Meters>1547</Meters>
</APB1>
<APB1>
<Current_Company_Name>EPCOR Electricity Distribution Ontario Inc.</Current_Company_Name>
<Historical_Company_Name>EPCOR Electricity Distribution Ontario Inc.</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>124</Pole_Towers_Fixtures>
<Line_Transformers>25</Line_Transformers>
<Meters>294</Meters>
</APB1>
<APB1>
<Current_Company_Name>EPCOR Electricity Distribution Ontario Inc.</Current_Company_Name>
<Historical_Company_Name>EPCOR Electricity Distribution Ontario Inc.</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>151</Pole_Towers_Fixtures>
<Line_Transformers>45</Line_Transformers>
<Meters>312</Meters>
</APB1>
<APB1>
<Current_Company_Name>ERTH Power Corporation</Current_Company_Name>
<Historical_Company_Name>ERTH Power Corporation</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>137</Pole_Towers_Fixtures>
<Line_Transformers>91</Line_Transformers>
<Meters>223</Meters>
</APB1>
<APB1>
<Current_Company_Name>ERTH Power Corporation</Current_Company_Name>
<Historical_Company_Name>ERTH Power Corporation</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>146</Pole_Towers_Fixtures>
<Line_Transformers>116</Line_Transformers>
<Meters>292</Meters>
</APB1>
<APB1>
<Current_Company_Name>Essex Powerlines Corporation</Current_Company_Name>
<Historical_Company_Name>Essex Powerlines Corporation</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>133</Pole_Towers_Fixtures>
<Line_Transformers>92</Line_Transformers>
<Meters>1325</Meters>
<APB1_Comments_Provided_By_Distributors>Poles, Towers, and Fixtures includes all, wood, steel, and concrete assets. Line transformers includes single phase and 3-phase pole and pad mounted assets. Meters includes single phase, 3-phase and special types meters installed to accommodate new services, upgrade services/meters, and complete meter reverifications.</APB1_Comments_Provided_By_Distributors>
</APB1>
<APB1>
<Current_Company_Name>Essex Powerlines Corporation</Current_Company_Name>
<Historical_Company_Name>Essex Powerlines Corporation</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>124</Pole_Towers_Fixtures>
<Line_Transformers>93</Line_Transformers>
<Meters>978</Meters>
<APB1_Comments_Provided_By_Distributors>Poles, Towers, and Fixtures includes all, wood, steel, and concrete assets. Line transformers includes single phase and 3-phase pole and pad mounted assets. Meters includes single phase, 3-phase and special types meters installed to accommodate new services, upgrade services/meters, and complete meter reverifications.</APB1_Comments_Provided_By_Distributors>
</APB1>
<APB1>
<Current_Company_Name>Festival Hydro Inc.</Current_Company_Name>
<Historical_Company_Name>Festival Hydro Inc.</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>89</Pole_Towers_Fixtures>
<Line_Transformers>64</Line_Transformers>
<Meters>1404</Meters>
</APB1>
<APB1>
<Current_Company_Name>Festival Hydro Inc.</Current_Company_Name>
<Historical_Company_Name>Festival Hydro Inc.</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>83</Pole_Towers_Fixtures>
<Line_Transformers>37</Line_Transformers>
<Meters>1421</Meters>
</APB1>
<APB1>
<Current_Company_Name>Fort Frances Power Corporation</Current_Company_Name>
<Historical_Company_Name>Fort Frances Power Corporation</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>13</Pole_Towers_Fixtures>
<Line_Transformers>7</Line_Transformers>
<Meters>135</Meters>
</APB1>
<APB1>
<Current_Company_Name>Fort Frances Power Corporation</Current_Company_Name>
<Historical_Company_Name>Fort Frances Power Corporation</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>14</Pole_Towers_Fixtures>
<Line_Transformers>8</Line_Transformers>
<Meters>171</Meters>
</APB1>
<APB1>
<Current_Company_Name>GrandBridge Energy Inc.</Current_Company_Name>
<Historical_Company_Name>GrandBridge Energy Inc.</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>669</Pole_Towers_Fixtures>
<Line_Transformers>492</Line_Transformers>
<Meters>2844</Meters>
</APB1>
<APB1>
<Current_Company_Name>GrandBridge Energy Inc.</Current_Company_Name>
<Historical_Company_Name>GrandBridge Energy Inc.</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>444</Pole_Towers_Fixtures>
<Line_Transformers>466</Line_Transformers>
<Meters>2162</Meters>
<APB1_Comments_Provided_By_Distributors>Meters installed includes installed (1,848) and warehoused meters (314).</APB1_Comments_Provided_By_Distributors>
</APB1>
<APB1>
<Current_Company_Name>Greater Sudbury Hydro Inc.</Current_Company_Name>
<Historical_Company_Name>Greater Sudbury Hydro Inc.</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>246</Pole_Towers_Fixtures>
<Line_Transformers>153</Line_Transformers>
<Meters>137</Meters>
</APB1>
<APB1>
<Current_Company_Name>Greater Sudbury Hydro Inc.</Current_Company_Name>
<Historical_Company_Name>Greater Sudbury Hydro Inc.</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>222</Pole_Towers_Fixtures>
<Line_Transformers>105</Line_Transformers>
<Meters>1038</Meters>
</APB1>
<APB1>
<Current_Company_Name>Grimsby Power Incorporated</Current_Company_Name>
<Historical_Company_Name>Grimsby Power Incorporated</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>129</Pole_Towers_Fixtures>
<Line_Transformers>28</Line_Transformers>
<Meters>171</Meters>
</APB1>
<APB1>
<Current_Company_Name>Grimsby Power Incorporated</Current_Company_Name>
<Historical_Company_Name>Grimsby Power Incorporated</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>105</Pole_Towers_Fixtures>
<Line_Transformers>39</Line_Transformers>
<Meters>1217</Meters>
<APB1_Comments_Provided_By_Distributors>N/A</APB1_Comments_Provided_By_Distributors>
</APB1>
<APB1>
<Current_Company_Name>Halton Hills Hydro Inc.</Current_Company_Name>
<Historical_Company_Name>Halton Hills Hydro Inc.</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>130</Pole_Towers_Fixtures>
<Line_Transformers>63</Line_Transformers>
<Meters>703</Meters>
</APB1>
<APB1>
<Current_Company_Name>Halton Hills Hydro Inc.</Current_Company_Name>
<Historical_Company_Name>Halton Hills Hydro Inc.</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>72</Pole_Towers_Fixtures>
<Line_Transformers>39</Line_Transformers>
<Meters>623</Meters>
</APB1>
<APB1>
<Current_Company_Name>Hearst Power Distribution Company Limited</Current_Company_Name>
<Historical_Company_Name>Hearst Power Distribution Company Limited</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>49</Pole_Towers_Fixtures>
<Line_Transformers>10</Line_Transformers>
<Meters>0</Meters>
</APB1>
<APB1>
<Current_Company_Name>Hearst Power Distribution Company Limited</Current_Company_Name>
<Historical_Company_Name>Hearst Power Distribution Company Limited</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>50</Pole_Towers_Fixtures>
<Line_Transformers>15</Line_Transformers>
<Meters>4</Meters>
</APB1>
<APB1>
<Current_Company_Name>Hydro 2000 Inc.</Current_Company_Name>
<Historical_Company_Name>Hydro 2000 Inc.</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>7</Pole_Towers_Fixtures>
<Line_Transformers>9</Line_Transformers>
<Meters>22</Meters>
</APB1>
<APB1>
<Current_Company_Name>Hydro 2000 Inc.</Current_Company_Name>
<Historical_Company_Name>Hydro 2000 Inc.</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>4</Pole_Towers_Fixtures>
<Line_Transformers>3</Line_Transformers>
<Meters>51</Meters>
</APB1>
<APB1>
<Current_Company_Name>Hydro Hawkesbury Inc.</Current_Company_Name>
<Historical_Company_Name>Hydro Hawkesbury Inc.</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>10</Pole_Towers_Fixtures>
<Line_Transformers>14</Line_Transformers>
<Meters>240</Meters>
</APB1>
<APB1>
<Current_Company_Name>Hydro Hawkesbury Inc.</Current_Company_Name>
<Historical_Company_Name>Hydro Hawkesbury Inc.</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>11</Pole_Towers_Fixtures>
<Line_Transformers>10</Line_Transformers>
<Meters>217</Meters>
</APB1>
<APB1>
<Current_Company_Name>Hydro One Networks Inc.</Current_Company_Name>
<Historical_Company_Name>Chapleau Public Utilities Corporation</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>0</Pole_Towers_Fixtures>
<Line_Transformers>0</Line_Transformers>
<Meters>0</Meters>
</APB1>
<APB1>
<Current_Company_Name>Hydro One Networks Inc.</Current_Company_Name>
<Historical_Company_Name>Hydro One Networks Inc.</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>17493</Pole_Towers_Fixtures>
<Line_Transformers>12520</Line_Transformers>
<Meters>74171</Meters>
</APB1>
<APB1>
<Current_Company_Name>Hydro One Networks Inc.</Current_Company_Name>
<Historical_Company_Name>Hydro One Networks Inc.</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>18630</Pole_Towers_Fixtures>
<Line_Transformers>15402</Line_Transformers>
<Meters>81849</Meters>
</APB1>
<APB1>
<Current_Company_Name>Hydro Ottawa Limited</Current_Company_Name>
<Historical_Company_Name>Hydro Ottawa Limited</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>828</Pole_Towers_Fixtures>
<Line_Transformers>513</Line_Transformers>
<Meters>15439</Meters>
</APB1>
<APB1>
<Current_Company_Name>Hydro Ottawa Limited</Current_Company_Name>
<Historical_Company_Name>Hydro Ottawa Limited</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>1159</Pole_Towers_Fixtures>
<Line_Transformers>715</Line_Transformers>
<Meters>22569</Meters>
</APB1>
<APB1>
<Current_Company_Name>InnPower Corporation</Current_Company_Name>
<Historical_Company_Name>InnPower Corporation</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>335</Pole_Towers_Fixtures>
<Line_Transformers>107</Line_Transformers>
<Meters>3623</Meters>
<APB1_Comments_Provided_By_Distributors>There are three types of capital additions in InnPower&apos;s records: 1. &quot;Real&quot; additions, which are physical assets added to the distribution system 2. &quot;Not Real - Betterment&quot; additions, where InnPower records capital work completed to existing assets in the capital additions amount, without adding an additional asset (i.e. betterment). 3. &quot;Not Real - Used&quot; additions. InnPower reuses transformers. Real additions are when we purchase a new transformer. Not Real - Used additions are when we bring in a transformer from the territory and reuse it on another job. Not real - used additions accumulate costs on the new job for labour, material and vehicles, however, they do not increase the quantity of equipment. The numbers reported are a total of all three types of capital additions 1830: &quot;Real&quot; additions 289 poles and &quot;Not Real - Betterment&quot; additions 46 poles 1850: &quot;Real&quot; additions 88 transformers, &quot;Not Real - Betterment&quot; additions 19 transformers and &quot;Not Real - Used&quot; additions 69 transformers 1860: &quot;Real&quot; additions 3606 meters and &quot;Not Real - Betterment&quot; additions 17 meters</APB1_Comments_Provided_By_Distributors>
</APB1>
<APB1>
<Current_Company_Name>InnPower Corporation</Current_Company_Name>
<Historical_Company_Name>InnPower Corporation</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>250</Pole_Towers_Fixtures>
<Line_Transformers>306</Line_Transformers>
<Meters>1699</Meters>
<APB1_Comments_Provided_By_Distributors>There are three types of capital additions in InnPower&apos;s records: 1. &quot;Real&quot; additions, which are physical assets added to the distribution system 2. &quot;Not Real - Betterment&quot; additions, where InnPower records capital work completed to existing assets in the capital additions amount, without adding an additional asset (i.e. betterment). 3. &quot;Not Real - Used&quot; additions. InnPower reuses transformers. Real additions are when we purchase a new transformer. Not Real - Used additions are when we bring in a transformer from the territory and reuse it on another job. Not real - used additions accumulate costs on the new job for labour, material and vehicles, however, they do not increase the quantity of equipment. The numbers reported are a total of all three types of capital additions 1830: &quot;Real&quot; additions 225 poles and &quot;Not Real - Betterment&quot; additions 25 poles 1850: &quot;Real&quot; additions 217 transformers, &quot;Not Real - Betterment&quot; additions 14 transformers and &quot;Not Real - Used&quot; additions 75 transformers 1860: &quot;Real&quot; additions 1685 meters and &quot;Not Real - Betterment&quot; additions 14 meters</APB1_Comments_Provided_By_Distributors>
</APB1>
<APB1>
<Current_Company_Name>Kingston Hydro Corporation</Current_Company_Name>
<Historical_Company_Name>Kingston Hydro Corporation</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>38</Pole_Towers_Fixtures>
<Line_Transformers>31</Line_Transformers>
<Meters>264</Meters>
</APB1>
<APB1>
<Current_Company_Name>Kingston Hydro Corporation</Current_Company_Name>
<Historical_Company_Name>Kingston Hydro Corporation</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>71</Pole_Towers_Fixtures>
<Line_Transformers>52</Line_Transformers>
<Meters>707</Meters>
</APB1>
<APB1>
<Current_Company_Name>Lakefront Utilities Inc.</Current_Company_Name>
<Historical_Company_Name>Lakefront Utilities Inc.</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>77</Pole_Towers_Fixtures>
<Line_Transformers>13</Line_Transformers>
<Meters>266</Meters>
<APB1_Comments_Provided_By_Distributors>Reference file 215 and 2158 - 2023 LUI fixed asset continuity schedule</APB1_Comments_Provided_By_Distributors>
</APB1>
<APB1>
<Current_Company_Name>Lakefront Utilities Inc.</Current_Company_Name>
<Historical_Company_Name>Lakefront Utilities Inc.</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>91</Pole_Towers_Fixtures>
<Line_Transformers>31</Line_Transformers>
<Meters>173</Meters>
</APB1>
<APB1>
<Current_Company_Name>Lakeland Power Distribution Ltd.</Current_Company_Name>
<Historical_Company_Name>Lakeland Power Distribution Ltd.</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>130</Pole_Towers_Fixtures>
<Line_Transformers>61</Line_Transformers>
<Meters>245</Meters>
<APB1_Comments_Provided_By_Distributors>The quantity of poles, transformers and meters provided here represent the equipment &apos;installed&apos; in the year, as reported. Please note the capital additions in transformer and meter capital accounts also include stock equipment purchased and capitalized in the same year but not necessarily installed.</APB1_Comments_Provided_By_Distributors>
</APB1>
<APB1>
<Current_Company_Name>Lakeland Power Distribution Ltd.</Current_Company_Name>
<Historical_Company_Name>Lakeland Power Distribution Ltd.</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>109</Pole_Towers_Fixtures>
<Line_Transformers>105</Line_Transformers>
<Meters>212</Meters>
<APB1_Comments_Provided_By_Distributors>The quantity of poles, transformers and meters provided here represent the equipment &apos;installed&apos; in the year, as reported. Please note the capital additions in transformer and meter capital accounts also include stock equipment purchased and capitalized in the same year but not necessarily installed.</APB1_Comments_Provided_By_Distributors>
</APB1>
<APB1>
<Current_Company_Name>London Hydro Inc.</Current_Company_Name>
<Historical_Company_Name>London Hydro Inc.</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>424</Pole_Towers_Fixtures>
<Line_Transformers>427</Line_Transformers>
<Meters>4032</Meters>
</APB1>
<APB1>
<Current_Company_Name>London Hydro Inc.</Current_Company_Name>
<Historical_Company_Name>London Hydro Inc.</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>589</Pole_Towers_Fixtures>
<Line_Transformers>406</Line_Transformers>
<Meters>4032</Meters>
</APB1>
<APB1>
<Current_Company_Name>Milton Hydro Distribution Inc.</Current_Company_Name>
<Historical_Company_Name>Milton Hydro Distribution Inc.</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>215</Pole_Towers_Fixtures>
<Line_Transformers>178</Line_Transformers>
<Meters>6961</Meters>
</APB1>
<APB1>
<Current_Company_Name>Milton Hydro Distribution Inc.</Current_Company_Name>
<Historical_Company_Name>Milton Hydro Distribution Inc.</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>58</Pole_Towers_Fixtures>
<Line_Transformers>133</Line_Transformers>
<Meters>2586</Meters>
<APB1_Comments_Provided_By_Distributors>N/A</APB1_Comments_Provided_By_Distributors>
</APB1>
<APB1>
<Current_Company_Name>Newmarket-Tay Power Distribution Ltd.</Current_Company_Name>
<Historical_Company_Name>Newmarket-Tay Power Distribution Ltd.</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>151</Pole_Towers_Fixtures>
<Line_Transformers>153</Line_Transformers>
<Meters>1747</Meters>
<APB1_Comments_Provided_By_Distributors>NT Power capitalizes all transformers and meters as they are purchased. The fiscal year 1850 and 1860 accounts will represent all transformers and meters purchased during the year, plus the additional labor/materials needed to physically install the assets in the field. Quantity of equipment installed in this table corresponds to assets installed in the field and does not include assets that were purchased and capitalized in the fiscal year.</APB1_Comments_Provided_By_Distributors>
</APB1>
<APB1>
<Current_Company_Name>Newmarket-Tay Power Distribution Ltd.</Current_Company_Name>
<Historical_Company_Name>Newmarket-Tay Power Distribution Ltd.</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>158</Pole_Towers_Fixtures>
<Line_Transformers>186</Line_Transformers>
<Meters>1058</Meters>
<APB1_Comments_Provided_By_Distributors>NT Power capitalizes all transformers and meters as they are purchased. The fiscal year 1850 and 1860 accounts will represent all transformers and meters purchased during the year, plus the additional labor/materials needed to physically install the assets in the field. Quantity of equipment installed in this table corresponds to assets installed in the field and does not include assets that were purchased and capitalized in the fiscal year.</APB1_Comments_Provided_By_Distributors>
</APB1>
<APB1>
<Current_Company_Name>Niagara Peninsula Energy Inc.</Current_Company_Name>
<Historical_Company_Name>Niagara Peninsula Energy Inc.</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>296</Pole_Towers_Fixtures>
<Line_Transformers>232</Line_Transformers>
<Meters>2946</Meters>
</APB1>
<APB1>
<Current_Company_Name>Niagara Peninsula Energy Inc.</Current_Company_Name>
<Historical_Company_Name>Niagara Peninsula Energy Inc.</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>241</Pole_Towers_Fixtures>
<Line_Transformers>142</Line_Transformers>
<Meters>174</Meters>
</APB1>
<APB1>
<Current_Company_Name>Niagara-on-the-Lake Hydro Inc.</Current_Company_Name>
<Historical_Company_Name>Niagara-on-the-Lake Hydro Inc.</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>75</Pole_Towers_Fixtures>
<Line_Transformers>53</Line_Transformers>
<Meters>440</Meters>
<APB1_Comments_Provided_By_Distributors>Poles are total installed Transformers and meters are total purchased</APB1_Comments_Provided_By_Distributors>
</APB1>
<APB1>
<Current_Company_Name>Niagara-on-the-Lake Hydro Inc.</Current_Company_Name>
<Historical_Company_Name>Niagara-on-the-Lake Hydro Inc.</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>75</Pole_Towers_Fixtures>
<Line_Transformers>53</Line_Transformers>
<Meters>440</Meters>
<APB1_Comments_Provided_By_Distributors>Poles are total installed. Transformers and meters are total purchased</APB1_Comments_Provided_By_Distributors>
</APB1>
<APB1>
<Current_Company_Name>North Bay Hydro Distribution Limited</Current_Company_Name>
<Historical_Company_Name>North Bay Hydro Distribution Limited</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>206</Pole_Towers_Fixtures>
<Line_Transformers>60</Line_Transformers>
<Meters>101</Meters>
</APB1>
<APB1>
<Current_Company_Name>North Bay Hydro Distribution Limited</Current_Company_Name>
<Historical_Company_Name>North Bay Hydro Distribution Limited</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>250</Pole_Towers_Fixtures>
<Line_Transformers>102</Line_Transformers>
<Meters>407</Meters>
</APB1>
<APB1>
<Current_Company_Name>Northern Ontario Wires Inc.</Current_Company_Name>
<Historical_Company_Name>Northern Ontario Wires Inc.</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>17</Pole_Towers_Fixtures>
<Line_Transformers>2</Line_Transformers>
<Meters>26</Meters>
</APB1>
<APB1>
<Current_Company_Name>Northern Ontario Wires Inc.</Current_Company_Name>
<Historical_Company_Name>Northern Ontario Wires Inc.</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>26</Pole_Towers_Fixtures>
<Line_Transformers>10</Line_Transformers>
<Meters>13</Meters>
</APB1>
<APB1>
<Current_Company_Name>Oakville Hydro Electricity Distribution Inc.</Current_Company_Name>
<Historical_Company_Name>Oakville Hydro Electricity Distribution Inc.</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>191</Pole_Towers_Fixtures>
<Line_Transformers>121</Line_Transformers>
<Meters>1068</Meters>
</APB1>
<APB1>
<Current_Company_Name>Oakville Hydro Electricity Distribution Inc.</Current_Company_Name>
<Historical_Company_Name>Oakville Hydro Electricity Distribution Inc.</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>304</Pole_Towers_Fixtures>
<Line_Transformers>208</Line_Transformers>
<Meters>1713</Meters>
</APB1>
<APB1>
<Current_Company_Name>Orangeville Hydro Limited</Current_Company_Name>
<Historical_Company_Name>Orangeville Hydro Limited</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>17</Pole_Towers_Fixtures>
<Line_Transformers>60</Line_Transformers>
<Meters>149</Meters>
<APB1_Comments_Provided_By_Distributors>For Account 1850, Line Transformers (Tx) for OHL includes &quot;not installed&quot; Txs. The FA Continuity additions of $1,221,881 includes an increase in inventory of $351,935. Therefore the addition $ corresponding to the 60 installed tranformers is $869,946.</APB1_Comments_Provided_By_Distributors>
</APB1>
<APB1>
<Current_Company_Name>Orangeville Hydro Limited</Current_Company_Name>
<Historical_Company_Name>Orangeville Hydro Limited</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>22</Pole_Towers_Fixtures>
<Line_Transformers>53</Line_Transformers>
<Meters>51</Meters>
<APB1_Comments_Provided_By_Distributors>For Account 1850, Line Transformers (Tx) for OHL includes &quot;not installed&quot; Txs. The FA Continuity additions of $799,077 includes a decrease in inventory of $18,507. Therefore the addition $ corresponding to the 53 installed tranformers is $817,584.</APB1_Comments_Provided_By_Distributors>
</APB1>
<APB1>
<Current_Company_Name>Oshawa PUC Networks Inc.</Current_Company_Name>
<Historical_Company_Name>Oshawa PUC Networks Inc.</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>206</Pole_Towers_Fixtures>
<Line_Transformers>68</Line_Transformers>
<Meters>1322</Meters>
</APB1>
<APB1>
<Current_Company_Name>Oshawa PUC Networks Inc.</Current_Company_Name>
<Historical_Company_Name>Oshawa PUC Networks Inc.</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>178</Pole_Towers_Fixtures>
<Line_Transformers>38</Line_Transformers>
<Meters>3093</Meters>
</APB1>
<APB1>
<Current_Company_Name>Ottawa River Power Corporation</Current_Company_Name>
<Historical_Company_Name>Ottawa River Power Corporation</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>45</Pole_Towers_Fixtures>
<Line_Transformers>15</Line_Transformers>
<Meters>298</Meters>
</APB1>
<APB1>
<Current_Company_Name>Ottawa River Power Corporation</Current_Company_Name>
<Historical_Company_Name>Ottawa River Power Corporation</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>49</Pole_Towers_Fixtures>
<Line_Transformers>25</Line_Transformers>
<Meters>436</Meters>
</APB1>
<APB1>
<Current_Company_Name>PUC Distribution Inc.</Current_Company_Name>
<Historical_Company_Name>PUC Distribution Inc.</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>185</Pole_Towers_Fixtures>
<Line_Transformers>129</Line_Transformers>
<Meters>1190</Meters>
<APB1_Comments_Provided_By_Distributors>Number of units installed</APB1_Comments_Provided_By_Distributors>
</APB1>
<APB1>
<Current_Company_Name>PUC Distribution Inc.</Current_Company_Name>
<Historical_Company_Name>PUC Distribution Inc.</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>154</Pole_Towers_Fixtures>
<Line_Transformers>129</Line_Transformers>
<Meters>1190</Meters>
<APB1_Comments_Provided_By_Distributors>Number of units installed</APB1_Comments_Provided_By_Distributors>
</APB1>
<APB1>
<Current_Company_Name>Renfrew Hydro Inc.</Current_Company_Name>
<Historical_Company_Name>Renfrew Hydro Inc.</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>40</Pole_Towers_Fixtures>
<Line_Transformers>12</Line_Transformers>
<Meters>113</Meters>
</APB1>
<APB1>
<Current_Company_Name>Renfrew Hydro Inc.</Current_Company_Name>
<Historical_Company_Name>Renfrew Hydro Inc.</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>54</Pole_Towers_Fixtures>
<Line_Transformers>7</Line_Transformers>
<Meters>181</Meters>
</APB1>
<APB1>
<Current_Company_Name>Rideau St. Lawrence Distribution Inc.</Current_Company_Name>
<Historical_Company_Name>Rideau St. Lawrence Distribution Inc.</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>24</Pole_Towers_Fixtures>
<Line_Transformers>6</Line_Transformers>
<Meters>56</Meters>
</APB1>
<APB1>
<Current_Company_Name>Rideau St. Lawrence Distribution Inc.</Current_Company_Name>
<Historical_Company_Name>Rideau St. Lawrence Distribution Inc.</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>21</Pole_Towers_Fixtures>
<Line_Transformers>13</Line_Transformers>
<Meters>269</Meters>
</APB1>
<APB1>
<Current_Company_Name>Sioux Lookout Hydro Inc.</Current_Company_Name>
<Historical_Company_Name>Sioux Lookout Hydro Inc.</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>26</Pole_Towers_Fixtures>
<Line_Transformers>8</Line_Transformers>
<Meters>0</Meters>
<APB1_Comments_Provided_By_Distributors>1830 - consists of 21 pole replacements and 5 new installations, 1850 - consists of all new installations, 1860 - there were no new smart meters purchased, the additions include CT/PTs and Collector/Gatekeeper upgrades</APB1_Comments_Provided_By_Distributors>
</APB1>
<APB1>
<Current_Company_Name>Sioux Lookout Hydro Inc.</Current_Company_Name>
<Historical_Company_Name>Sioux Lookout Hydro Inc.</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>32</Pole_Towers_Fixtures>
<Line_Transformers>16</Line_Transformers>
<Meters>110</Meters>
<APB1_Comments_Provided_By_Distributors>1830 - consists of 15 pole replacements and 17 new installations, 1850 - consists of 8 replacements and 8 new installations, 1860 - additions include meters put into service in 2024</APB1_Comments_Provided_By_Distributors>
</APB1>
<APB1>
<Current_Company_Name>Synergy North Corporation</Current_Company_Name>
<Historical_Company_Name>Synergy North Corporation</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>498</Pole_Towers_Fixtures>
<Line_Transformers>152</Line_Transformers>
<Meters>689</Meters>
</APB1>
<APB1>
<Current_Company_Name>Synergy North Corporation</Current_Company_Name>
<Historical_Company_Name>Synergy North Corporation</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>426</Pole_Towers_Fixtures>
<Line_Transformers>225</Line_Transformers>
<Meters>703</Meters>
</APB1>
<APB1>
<Current_Company_Name>Tillsonburg Hydro Inc.</Current_Company_Name>
<Historical_Company_Name>Tillsonburg Hydro Inc.</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>26</Pole_Towers_Fixtures>
<Line_Transformers>10</Line_Transformers>
<Meters>81</Meters>
</APB1>
<APB1>
<Current_Company_Name>Tillsonburg Hydro Inc.</Current_Company_Name>
<Historical_Company_Name>Tillsonburg Hydro Inc.</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>15</Pole_Towers_Fixtures>
<Line_Transformers>11</Line_Transformers>
<Meters>107</Meters>
</APB1>
<APB1>
<Current_Company_Name>Toronto Hydro-Electric System Limited</Current_Company_Name>
<Historical_Company_Name>Toronto Hydro-Electric System Limited</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>4774</Pole_Towers_Fixtures>
<Line_Transformers>2142</Line_Transformers>
<Meters>15767</Meters>
</APB1>
<APB1>
<Current_Company_Name>Toronto Hydro-Electric System Limited</Current_Company_Name>
<Historical_Company_Name>Toronto Hydro-Electric System Limited</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>3548</Pole_Towers_Fixtures>
<Line_Transformers>3780</Line_Transformers>
<Meters>47852</Meters>
<APB1_Comments_Provided_By_Distributors>No comments.</APB1_Comments_Provided_By_Distributors>
</APB1>
<APB1>
<Current_Company_Name>Wasaga Distribution Inc.</Current_Company_Name>
<Historical_Company_Name>Wasaga Distribution Inc.</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>139</Pole_Towers_Fixtures>
<Line_Transformers>73</Line_Transformers>
<Meters>1296</Meters>
</APB1>
<APB1>
<Current_Company_Name>Wasaga Distribution Inc.</Current_Company_Name>
<Historical_Company_Name>Wasaga Distribution Inc.</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>177</Pole_Towers_Fixtures>
<Line_Transformers>50</Line_Transformers>
<Meters>323</Meters>
</APB1>
<APB1>
<Current_Company_Name>Welland Hydro-Electric System Corp.</Current_Company_Name>
<Historical_Company_Name>Welland Hydro-Electric System Corp.</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>92</Pole_Towers_Fixtures>
<Line_Transformers>73</Line_Transformers>
<Meters>1228</Meters>
</APB1>
<APB1>
<Current_Company_Name>Welland Hydro-Electric System Corp.</Current_Company_Name>
<Historical_Company_Name>Welland Hydro-Electric System Corp.</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>122</Pole_Towers_Fixtures>
<Line_Transformers>129</Line_Transformers>
<Meters>913</Meters>
</APB1>
<APB1>
<Current_Company_Name>Wellington North Power Inc.</Current_Company_Name>
<Historical_Company_Name>Wellington North Power Inc.</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>48</Pole_Towers_Fixtures>
<Line_Transformers>35</Line_Transformers>
<Meters>364</Meters>
</APB1>
<APB1>
<Current_Company_Name>Wellington North Power Inc.</Current_Company_Name>
<Historical_Company_Name>Wellington North Power Inc.</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>48</Pole_Towers_Fixtures>
<Line_Transformers>17</Line_Transformers>
<Meters>537</Meters>
</APB1>
<APB1>
<Current_Company_Name>Westario Power Inc.</Current_Company_Name>
<Historical_Company_Name>Westario Power Inc.</Historical_Company_Name>
<Year>2023</Year>
<Pole_Towers_Fixtures>239</Pole_Towers_Fixtures>
<Line_Transformers>99</Line_Transformers>
<Meters>218</Meters>
</APB1>
<APB1>
<Current_Company_Name>Westario Power Inc.</Current_Company_Name>
<Historical_Company_Name>Westario Power Inc.</Historical_Company_Name>
<Year>2024</Year>
<Pole_Towers_Fixtures>217</Pole_Towers_Fixtures>
<Line_Transformers>185</Line_Transformers>
<Meters>1634</Meters>
</APB1>
</dataroot>